Project Background The client is a Tier-2 commercial bank with 40 branches across the central region, processing approximately 18,000 card transactions daily through a centralized data center. The Power Reliability Problem Three to four grid events per month were causing complete branch network isolation, with each incident averaging 7 minutes of recovery time. BS Comtec […]
Modular UPS Solution for Steel Manufacturing Plant
Industrial Power Challenge Voltage sags from thyristor-driven rolling mills were creating PLC fault shutdowns 8-12 times per year. Engineering Response We deployed modular Vertiv UPS architecture with 200kVA continuous capacity and 60-minute battery backup at full load. Quantified Outcomes Zero unplanned PLC shutdowns over 18 months, 92% reduction in scrap rate. Contact us for similar […]